29 September 2017

Framing Photo Fest

Drove up this afternoon to see the progress and make sure the framing is what wew want. It gets really hard to fix things later.  The interior doors on the main floor are all going to get reframed so they are 8'. With 10' ceilings, it just makes more sense and looks better.

The staircase from the main to the top floor is temprorary. The *real* staircase will be using glulam stringers and treads. 

The roof beams and joists have all be delivered. They couldnt' get a crane up there until Monday. (I hadn't realized how tall the building is. It's TALL.

View from the street with the roof joists across the driveway.

Top floor looking from the SW corner looking to the NE corner.

Looking at the West wall. It's awaiting beams on either side of the taller center part of the wall. 

Looking at the South wall (bedroom) from the bunk room. 

Closeup of the South wall (bedroom).

Looking at the North wall (bunk room)

Temporary staircase from the main floor to the top floor. 

Looking North out the main floor door to what will be a small deck.

The view out the North wall on the main floor.

Looking at the North wall on the main floor.

Main floor fireplace framing. (It's wrong.... They need to reframe it so there's a 2ft space below the fireplace for storing wood.)

The view South out the main floor powder room.


Looking up at the North facing wall from the NE corner.
 
Looking up at the North acing wall from the NW corner.
 
Looking up at the front door and the SE corner of the cabin.

Looking at the East wall of the cabin.

There's a lot on the docket next week:
  • Roof joists get placed with a crane.
  • Roof deck (and possibly metal roof) will get installed.
  • Slab on grade should get poured.
  • Windows delivered midweek.
  • Septic install begins.
  • Garage door may bet installed.
And, of course, I'll be out of town for all of it (again).