Made good progress on the drainage plumbing today. The upper floor is essentially "plumbed," except for the vents, which I'm doing last.
The above picture shows the shower p-trap connecting up to the sink drain, and then running through the joists and over to the wall. Getting all these fittings and pipes hooked-up and with the right slope.
I decided to route all of the runs down the 1st floor wall. They'll converge in the basement wall below. I got the holes drilled through the bottom plate, but ran out of 3" fittings.
ABS glue is pretty sticky/goopy when wet, but it peels off easily after it dries, even off of clothing (for the most part).
The snow has melted enough that I was able to drive all the way to the cabin. The 2018 construction season is officially open.
No comments:
Post a Comment