Hit stride plumbing ABS

Made good progress on the drainage plumbing today. The upper floor is essentially "plumbed," except for the vents, which I'm doing last.

The above picture shows the shower p-trap connecting up to the sink drain, and then running through the joists and over to the wall. Getting all these fittings and pipes hooked-up and with the right slope.

I decided to route all of the runs down the 1st floor wall. They'll converge in the basement wall below.  I got the holes drilled through the bottom plate, but ran out of 3" fittings.

ABS glue is pretty sticky/goopy when wet, but it peels off easily after it dries, even off of clothing (for the most part).

The snow has melted enough that I was able to drive all the way to the cabin. The 2018 construction season is officially open.