Katie and I finished up the last of the metal siding panels on the back of the Haus on Friday, and I finished all of the corner trim on Saturday. It took one calendar month and 13 work days to complete the siding -- double what I had originally thought.
We avoided rain on Friday. I went up alone on Saturday: Deluge.
Now, mind you, the "siding" isn't actually done, just the "metal siding". I'm ordering Hardie Panel to install on the top floor at the front of the Haus this coming week. After that's completed, I'll breath a sigh of relief for this winter.
Oh, and there's also the shiplap wood to put in the door alcove. But that's undercover and can be done in poor weather.
Installing the rest of the metal flashing on front corners will have to wait until the the Hardie Panel and shiplap are installed.
Here's a quick reprise on each of the sides. (I didn't take fresh pictures of everything because it was raining.)
We avoided rain on Friday. I went up alone on Saturday: Deluge.
Friday: Back (North) side of the Haus and beginnings of the corner trim.
Trim on the NW corner.
Trim on the NW corner.
Trim on the SW corner.
Trim on the SW corner.
Trim on NE corner.
For bonus points, I put up the brown flashing between the corner and the beam along the top plate.
Now, mind you, the "siding" isn't actually done, just the "metal siding". I'm ordering Hardie Panel to install on the top floor at the front of the Haus this coming week. After that's completed, I'll breath a sigh of relief for this winter.
Oh, and there's also the shiplap wood to put in the door alcove. But that's undercover and can be done in poor weather.
Installing the rest of the metal flashing on front corners will have to wait until the the Hardie Panel and shiplap are installed.
Here's a quick reprise on each of the sides. (I didn't take fresh pictures of everything because it was raining.)