While Katie did some final tweaking on the electrical box rough-ins in the upstairs bedrooms, including the smoke detector boxes, I started in on the water supply plumbing roughins. The grand strategy in all this is to get all the locations fixed so that we know where to drill all the holes. (I purchased all the supplies and tools for expansion PEX over the Christmas holiday.)
Downstairs bathroom sink
Downstairs bathroom toilet
Basement wet bar sink
Laundry room washer shutoff and drain
Main level toilet room
I'm take the week of July 4th off work to drill holes and run PEX and wires.