Katie continued making Swiss cheese of our framing, while I finished up the PEX plumbing to the upstairs: 1 shower, 2 toilets, 3 faucets.
This was my brilliant idea to move the toilet shutoff from the back wall to the side wall, which avoided having to navigate around the HUGE beam underneath the wall or having to navigate around some very tight corners. Brilliant.
Routed the PEX around the corner. Victorious.
This is the master toilet room. Notice the in-wall, in-line shutoff valves for the wall mounted faucet.
Expanding the PEX to make connections on the double-sink wall.
The plumbing to the double-sink wall. Also note the in-line shutoff valves to both sinks and the shower.
The PEX emerging through the ceiling of the main level from the upper floor. (Tomorrow, I'll focus on routing the PEX through the floor joists and down the kitchen shear wall.)
Unraveling the PEX coil hanging from the ceiling.
Katie paid a visit to the Northern edge of our property.
We took a birthday trip to Leavenworth after we finished at the cabin and enjoyed an 83 degree dinner on the patio at Gustav's.