The drywallers were able to finish the Saturday after Thanksgiving (using chains on their van).
BEFORE: Family room wall with 2 coats of mud
AFTER: Family room primed and textured.
BEFORE: Kitchen wall with 2 coats of mud.
AFTER: Kitchen wall primed and textured.
Now that the drywallers are done making their mess, I took the opportunity to hookup the infloor heatwing on the main floor. Of course, I forget to take a picture of the "after", but here's a picture of the wires and rough-in box.
Main floor thermostat rough-in box.
The thermostat box was a little challenging to wire up. All the copper grounds wired together and stuffed in the back of the box. Three sets of wires from the heatwing matts on the lower right were hooked-up with the capped 10-gauge wires on the upper right. 12-gauge wires on the lower left to power the thermostate. And the 10-gauge wires at the top from the termostat to the relay that switches the matts on/off.
I'm scurrying to get the snow tracks mounted on the side-by-side. Our final 3 doors are completed, and we need it to haul the doors from delivery truck (that can't come up the road now that there's snow) to the cabin.
We're also getting ready to place a kitchen cabinet order.
No comments:
Post a Comment