25 April 2020

Finished pine on main level

Finished installing the beetle-stain, blue pine on the main floor.


After finishing the wood on the main floor, I assembled my new 6 ft. rolling work platform, then moved all the saws, nailers, saw horses, extension cords and a supply of plywood and pine to the top floor so that I can begin the wood there on my next visit.

Katie took Mackenley sledding, suffered through working with me on a challenging cutout in the pine around the top of the back door, and painted the door jambs on the top and main floors.


Mackenley did some sledding, watched 3 movies on the iPad, turned his nose up at a frozen Indian curry meal (the green beans in particular), and helped me shopvac the miter saw.

First (late season) snowman of this kid's life.

The snow has melted noticeably. I'm guessing there's still about 5 to 6 feet on the ground, but it's down from the lofty heights last month, and obviously down from our visit last week. 

No comments:

Post a Comment