Katie and I enjoyed an exhausting day putting up Tyvek around the first framed floor of KnArrow Haus. That's all the further we could go with the available ladders. The rest of the Tyvek will go on in a week when the siding gets delivered and we have pump jacks to go all the way up the side of the Haus.
I also took the opportunity to return all the surpluss ABS fittings, now that I've completed the drainage plumbing -- about $60 in returns.
I confirmed which burried tank the plumbing drains in to so that I can put an expanding baloon in the pipe to stop it up and conduct a pressure test -- required by the county before passing inspection. I would have done a pretest today, but my neighbor turned off the water to his house preventing me from borrowing his hose spiggot.
This coming week I need to acquire the pump jacks, which provide a moveable platform for installing the siding. Siding gets delivered a week from Monday.
I also took the opportunity to return all the surpluss ABS fittings, now that I've completed the drainage plumbing -- about $60 in returns.
I confirmed which burried tank the plumbing drains in to so that I can put an expanding baloon in the pipe to stop it up and conduct a pressure test -- required by the county before passing inspection. I would have done a pretest today, but my neighbor turned off the water to his house preventing me from borrowing his hose spiggot.
This coming week I need to acquire the pump jacks, which provide a moveable platform for installing the siding. Siding gets delivered a week from Monday.