Katie, Annie, Abbie, Amelia and I all went to the cabin on an emergency Monday to get the in-floor heat ready for concrete in the morning. It was an awesome day. Much more work and time thany any of us expected.
The girls, including an expecting mother, ruled the day.
After Saturday, I decided to buy a couple electric staplers, and 10,000 3/8" staples. We went through 7,500 staples today. The floors will be poured 1" thick. Chicken wire just doesn't lay down very nicely without a lot of staple persuasion.
Major changes Tuesday morning. Concrete truck and pumper truck arrive at 10 am.
The girls, including an expecting mother, ruled the day.
(Left to Right) Katie, Amelia, Abbie, Annie.
After Saturday, I decided to buy a couple electric staplers, and 10,000 3/8" staples. We went through 7,500 staples today. The floors will be poured 1" thick. Chicken wire just doesn't lay down very nicely without a lot of staple persuasion.
Finishing up the hallway is the pregnant daughter.
Katie stapling down the chicken wire in the master bedroom.
Abbie nailing down chicken wire in the master bedroom.
Amelia keeping everyone entertained and cheering us on.
The bunkroom ready for concrete floors.
The main floor from the upper stairewall.
The master bedroom ready for concrete.
The master toilet room ready for concrete.
The hallway from the master bedroom.
The shower room is taped off to remind the workers not to pour the concrete in there.
I'll be installing Wedi board and tile.
The upstairs toilet room.
Katie gets sole credit for prep'ing the bunkroom.
Katie in the upstairs hallway.
Looking downstairs from the upstairs landing.
The main floor ready for concrete.
The entry mudroom ready for concrete.
We arrived at 10:30 am and pulled away at 6:36 pm.
Major changes Tuesday morning. Concrete truck and pumper truck arrive at 10 am.