We took another evening trip up to KnArrow Haus this evening to setup some additional heaters and fans to make sure the first coat of tape and mud will dry.
Looking really good. Although not entirely apparent in my pictures below, I'm doing a "trimless" installation -- no baseboard or door moldings. A littlle more expensive to do with the drywallers, but virtually no trim material or work to put it in. Ahhhh. I think it all nets out to the same cost but less work and less time (for me).
Looking really good. Although not entirely apparent in my pictures below, I'm doing a "trimless" installation -- no baseboard or door moldings. A littlle more expensive to do with the drywallers, but virtually no trim material or work to put it in. Ahhhh. I think it all nets out to the same cost but less work and less time (for me).
Kitchen wall.
Family room wall.
Bunk room.
Master bedroom.
Master bedroom.
Basement.
I think there's one more coat of mud to go, then a very light orange peel texture. And just in time: Snow's in the forecast this weekend.
No comments:
Post a Comment