21 March 2020

Final 3 interior doors in and beetle pine started

After a decidely isolating week, courtesy of the Corona virus, Katie and I hopped in the car and spent a beautiful, bluebird Spring day sheltering-in-pace working at KnArrow Haus. We started out day  installing the final 3 interior doors. They were special order doors and didn't get delivered until after the drywall was completed.

Angled door to the under stairs closet.

Door to the basement at the bottom of the stairs

Airlock door between the mudroom and the kitchen and family room

We finished the day by beginning to install the beetle-stained pine that's been sitting in the Haus since it was dried-in -- over 2 years.

Beetle-stained pine in the main floor powder room.

Laser level in the entry mudroom.

First two rows of pine in the mudroom.

We pulled out at 6:00 pm -- still light out and 40 degrees. 


There were a lot of cars of owners sheltering in place at their cabins today.

Not a single car in the parking lots at Stevens Pass, which is now closed for the season with all the other ski resorts in the state.  