07 March 2020

Social distancing at KnArrow Haus

A beautiful day for Katie and me to practice our "social distancing" at KnArrow Haus.  She finished priming the upstairs and began priming the basement. I finished installing the floating shelf brackets in the kitchen. 
Katie pulling her painting supplies out of her highly-fashionable equipment transport bag.

Katie priming the downstairs walls.

The floating shelf brackets on the kitchen wall.

Because there are pipes and electrical wiring in the wall that prevent installing some of the brackets, I'm ordering some additional front-mount brackets.


View of the brackets from the backside of the wall.

I needed to get all of these brackets installed so that we can put up the tongue-and-groove beetle stained pine.


Sammie played foreman.

And he explored our neighbor's foundation during a potty break.

View of the front door (and snow) from Schneewagen.

Light snow flurries interspersed with sun breaks throughout the day.

No comments:

Post a Comment